To achieve these, real stone paint construction skills and deep!
Hits: 3890621
2020-03-26
It is one of the most concerned problems in the selection and purchase of real stone paint to guide the construction and pollution resistance of real stone paint.
One
Wall base treatment
1. Materials and tools: 200 mesh sandpaper, oilstone or angle grinder;
2. First check the base course, remove the floating particles and residues on the surface to ensure that the surface is clean, free of loose materials and moisture;
3. Repair the tiny cracks, sand holes and external corners in all directions;
4. The repaired part shall be polished with coarse sandpaper to ensure that the texture is consistent with the large area after repair, and the floating ash shall be cleaned to ensure that the combination of the facing layer and the base layer is firm.
Acceptance standard: the surface shall be firm, free of loose substance, crack, clean and dry, without moisture, sand hole, hollowing, mortar pimple, obvious concave convex part, etc., and free of oil stain, floating ash and other pollutants.
Two
Apply damp proof putty twice
1. Use waterproof putty to scrape on the anti crack layer mortar for leveling. The putty must be compatible with the anti crack mortar. It is better to use the products of the same enterprise. Otherwise, different expansion and contraction will lead to different sizes of cracks in the real stone paint.
2. The putty shall be prepared on site, evenly stirred, in the form of toothpaste, and shall be used up once after preparation. Dilution ratio: Powder: water = 100:20 ~ 29, i.e. add 5 ~ 7.25kg water to each bag of 25kg powder, and prevent rain, hot sunshine and frost for at least 12h after construction. The construction temperature is 5-35 ℃, and the relative humidity of air is 75%.
3. During construction, the putty shall be evenly applied on the base surface with a spatula, and the thickness of each batch shall be controlled within 0.8mm, with 1-2 coats applied. The second coat shall be applied after the first coat is completely dry.
4. After the putty is dry and solid, it shall be polished until the surface is smooth without scratches, and the floating ash shall be removed. The surface flatness deviation shall be controlled within 2mm.
5. After the putty is dry, the next process can be carried out.
Acceptance standard: the surface shall be flat, uniform, clean, free of scratches, cracks, straight internal and external corners, square, floating ash and other sundries.
Three
Roll coating alkali resistant primer
1. After the surface treatment of the base course, it shall be carefully inspected to confirm that it meets the requirements. After the moisture content of the base course is less than 10%, the base wall sealing primer construction shall be carried out;
2. Before the base course is sealed, the metal parts such as doors and windows, air conditioning supports, etc. shall be wrapped and covered as necessary, and shall be removed after the overall spraying to prevent pollution and corrosion;
3. Before the construction of base sealing primer, it shall be diluted in strict accordance with the dilution ratio specified by the product, and attention shall be paid to that the primer shall be fully mixed during dilution to ensure uniformity;
4. The primer can be applied after the putty is completely dry;
5. The next process shall be started 4-6 hours after the primer is applied; acceptance standard: uniform spraying, no leakage, no bottom leakage, no sagging.
Four
Snap line of dividing seam
According to the requirements, the wall shall be divided into grids from the top to the bottom at the same time, so as to ensure that the corresponding mortar joints around are on the same horizontal line, and all vertical mortar joints are parallel and plumb to make the mortar joints horizontal and vertical.
Acceptance criteria: horizontal and vertical lines, uniform width of double parallel lines, clear and clear.
Five
Brush grid joint paint
The grid joint paint is applied to brush the grid joint. In order to ensure that the grid joint does not show the exposed bottom, the brush width of the grid joint paint can be a little wider than the design width to ensure that the grid joint paint is full within the width range of the grid joint.
Acceptance standard: the paint shall be applied horizontally and vertically, with the same width and width, and the same depth, and the internal dividing seam shall be full, with distinct effect, without exposing the bottom, peeling or polluting other parts.
Recommendation of excellent enterprises
Six
Secondary snapping of grid joint
Since the first snap line of the grid joint has been covered after the application of the grid joint paint, in order to make the tape grid straight, the second snap line only needs to pop up one side line of the grid joint.
Seven
Pasted grid stitched masking paper
When pasting the masking paper, align it with the snap line of the second dividing seam.
Acceptance standard: the masking paper shall be pasted firmly, tightly and straightly, and shall not damage the dividing line or damage the seam paint.
Eight
Stone paint spraying
1. The real stone paint shall be diluted in strict accordance with the specified dilution ratio of the product. When diluting, the real stone paint shall be fully stirred to ensure uniformity;
2. Spraying shall be carried out from top to bottom in sequence;
3. During the construction, the coating shall be connected to the grid line or window cover to avoid color difference at the joint;
4. When the construction of different real stone paint is completed, the construction of another color of real stone paint can only be carried out after the construction of one kind of real stone paint is completed and the surface is dried. During the construction, the other color of real stone paint shall be protected to prevent pollution;
5. Before using the real stone paint, it must be thoroughly stirred evenly, and the bucket cover shall be tightly closed during the construction to prevent the coating from skinning;
6. Spray method shall be adopted for construction, and trial spray shall be carried out before construction to determine construction factors such as nozzle, working pressure, moving speed of spray gun, etc. to ensure the quality and effect of application.
Acceptance criteria: uniform spraying, consistent thickness, consistent color, uniform particle point shape, size in line with the requirements, no bottom exposure, no leakage, no sagging and other phenomena, no accumulated material at the internal corner, no pollution to doors, windows, glass and other parts.
Nine
Stone paint grinding
Before spraying the waterproof protective film, the sharp angle of floating sand and sand particles on the surface of the dried coating shall be removed with ordinary 400-600 mesh sandpaper to increase the aesthetic feeling of the natural stone paint surface and ensure the complete coverage of the protective film. Do not use too much force, otherwise, it will damage the paint film, cause the bottom to loosen, and in serious cases, it will cause bad adhesion, falling off of real stone paint and other bad phenomena.
Ten
Tear off the Gingham paper
1. Before the tape is torn off, the paper cutter shall be used to cut the vertical tape at the vertical and horizontal joints, along the direction parallel to the horizontal tape, so as to avoid the falling off of the real stone paint when the tape is torn off;
2. The paper uncovering time shall be controlled. The faster the paper uncovering time is, the better. The time shall be shortened as far as possible so as to avoid peeling and damage of the real stone paint surface.
3. Uncovering direction, nearly 180 degrees open line.
Eleven
Dividing seam treatment
After the split joint treatment tape is torn off, the mortar joint shall be sorted and repaired to ensure that the mortar joint is straight and uniform in width and width. During the repair, secondary pollution shall be avoided.
Twelve
Roll on dust cover finish
1. After the completion of the construction of real stone finish, the coating surface shall be hard dry, dry for more than 24 hours in sunny days, and extend the drying time in rainy days before the coating coating construction;
2. The top coat shall be diluted in strict accordance with the dilution ratio specified by the product, and it shall be fully stirred during dilution to ensure uniformity;
3. Roll coating construction shall be carried out from top to bottom in sequence;
4. During the construction, the coating shall be connected to the grid line or window cover to avoid color difference at the joint;
5. Spray coating and roll coating can be used for construction.
Acceptance standard: uniform finish, consistent color, no leakage, no sagging, no bottom leakage, no accumulation at internal corners.
The poor antifouling performance of real stone paint refers to that dust and dirt are easy to deposit and penetrate, rainwater and artificial are difficult to remove, which fundamentally affects the appearance of the building.
So how to solve the problem of antifouling? The old saying goes again: "three products, seven construction". All properties of genuine stone paint depend on two aspects: first, the quality of the product itself (the quality of raw materials, the content of the emulsion), and the two is the construction technology.
Recommendation of excellent enterprises
Product testing
Mortar, putty, concrete, gypsum, waterproof, heat preservation, floor coating
Testing business consultation: 18811053485 18701149098
Recommended reading
Click on the following title to read more
Plastering engineering ︱ ready mixed mortar ︱ polyphenyl class a insulation ︱ tile adhesive
Wet mixed mortar mortar mixing genuine stone paint diatom mud waterproof mortar
Rock wool board putty de dusting, foaming, falling off, turning yellow, falling off?
Insulation structure integration latex powder vs resin rubber powder insulation board falling off
Putty formula insulation integrated board lime calcium powder real stone paint spraying
Plastering gypsum self leveling mortar putty powder 33 question mortar spraying
Thermal insulation mortar ︱ future of thermal insulation industry ︱ external wall thermal insulation construction strategy
Hydroxypropyl methylcellulose intelligent packaging machine polyvinyl alcohol powder
Statement:
The articles published, reprinted and excerpted from mortar and thermal insulation are from the Internet. Please contact QQ: 362644513 for copyright issues
Industry selection and efficient communication to create industry quality media
Platform cooperation hotline of Qihang media: 18811053485
Insulation engineering network: bwgcw.com new mortar network: maor.cn
Floor information network: diping66.com waterproof construction network: fssgw.com
Coating enterprise network: tulio88.com machine construction Alliance: 7hunion.com
Concrete information network: hntxxw.com "mortar & insulation" magazine